Crossovers
Your crossover belongs to council. We prepare the application, lodge the vehicle crossing permit, coordinate inspections, and pour to the City of Greater Dandenong's spec. You sign one form, we chase everything.
Your crossover — the section of concrete that crosses the nature strip from the kerb to your boundary — belongs to council, not to you. Any new or replacement crossover in Greater Dandenong needs a vehicle crossing permit from the City of Greater Dandenong, and the work has to be reinstated to the council's specification. That includes the width, the thickness, the finish, and the way it ties into the kerb and channel.
Most concreters leave the paperwork to the homeowner. You fill in the forms, you lodge them, you wait for the inspection, you make sure the build meets the spec. It's a hassle, and it's the part of a driveway job that most people don't know about until they're in the middle of it. We handle all of it. We prepare the application, lodge it, coordinate the inspections, and pour to the council's detail. You sign one form at the start and you're done.
The permit typically takes 2–4 weeks through Greater Dandenong. We lodge early — often before the driveway quote is finalised — so the permit is ready when we are. If you're replacing a crossover as part of a driveway replacement, we package the two together so the crossover and the driveway are poured in the same visit, to matching levels and finishes. No separate crew, no separate timeline, no join that doesn't match.
FAQ
The vehicle crossing permit through the City of Greater Dandenong typically takes 2–4 weeks. We lodge the application early in the process — often before the driveway quote is finalised — so the permit is ready when we are. If you have a tight timeline, tell us and we'll lodge the permit as the first step.
It depends on setbacks, street trees, and the council's crossover policy for your street. We check all three before you commit to anything — we measure the available width, check for street trees that can't be removed, and confirm the council will approve the width. If it's not going to work, we tell you before you spend money on a permit application.
Free Written Quote
Call now — we'll check the council spec for your street, lodge the permit, and pour to spec. One contractor, start to finish.