Got a question about concrete curing, cracking or permits in Dandenong? Here are the answers we give most often. If yours isn't here, call us on 0407 977 529 — we're happy to talk it through.
FAQ
24–48 hours after the pour for foot traffic. The surface is set enough to walk on but not yet at strength. Keep pets and heavy foot traffic off for the first day.
7 days. Concrete reaches about 70% of its strength in 7 days, which is enough for vehicle traffic. Full strength takes 28 days, but for a residential driveway, 7 days is the rule. We apply a cure-and-seal compound on pour day to help the concrete cure evenly.
We watch the forecast. If heavy rain or frost is due on pour day, we postpone — pouring into water or onto frozen ground weakens the slab. In winter we can pour with cold-weather precautions (accelerators, early covers), but we never rush a pour into bad conditions. The concrete comes first.
FAQ
All concrete cracks — the goal is controlling where. Proper excavation, a compacted rock base, F62 steel mesh on chairs, and control joints placed where the ground wants to move. That combination keeps cracks as hairlines inside the joints where they belong, not across the slab. A crack inside a control joint is normal; a crack across the slab is a failure.
Every 2–4 years depending on wear and exposure. A penetrating sealer soaks into the surface and blocks oil, water and stains. When water stops beading on the surface, it's time to reseal. We can do it for you or recommend the right product for DIY.
Yes — the exposed stone gives grip when wet, which is exactly what a sloped driveway or path needs. Plain concrete on a slope can be slippery when wet; exposed aggregate is the safer choice. We recommend it for any driveway with more than a gentle fall.
FAQ
If the works touch the nature strip — a new or replacement crossover, or any work within the road reserve — you need a vehicle crossing permit from the City of Greater Dandenong. We prepare and lodge the permit for you. You sign one form, we chase everything.
Most residential driveways take 2 days on site: excavation and form-up on day one, pour and finish on day two. The concrete then cures for 7 days before you can park on it. If a crossover permit is needed, add 2–4 weeks for the council approval before we start.
Clear access to the site, confirmation of the finish and colour, and any shed or garage drawings if we're pouring a shed slab. We handle the rest — permits, materials, the pour, the cleanup. We'll give you a checklist at quote time so nothing is left to the last minute.